BVT equipment helps set records!

On September 18, the Production Association “Belorusneft” announced on its official telegram channel https://t.me/Belorusneft_official a new production record and a successful multi-stage hydraulic fracturing using Zipper-frac technology at two sites simultaneously.

6 stages of hydraulic fracturing were completed in one day using one hydraulic fracturing fleet at the Rechitsa oil field. This is an absolute record for Belorusneft. For the first time, the work was carried out according to the developed scheme using one hydraulic fracturing fleet, which worked at two sites simultaneously depending on the readiness of the stage.

It should be noted that all perforation and blasting operations with the installation of packer plugs and targeted sequential initiation of perforators during the multi-stage hydraulic fracturing were carried out by BVT assemblies. The entire range of equipment and components was developed and produced in the Russian Federation. The work was carried out normally, without any deviations from the technological process.

Detailed information of the work performed:

JSC “BVT” has been successfully cooperating with PA “Belorusneft” on the supply of perforating equipment for multi-stage hydraulic fracturing, and on the implementation of the entire range of works using the Plug@Perf technology since 2018.


previous new next new