Товары

PKO102-SKIF

* — phasing is possible: 0, 45, 90, 180 — according to Customer’s request

** — other density is possible according to Customer’s requirement

*** — execution of VD by special order

**** — other body lengths are available on Customer’s request

***** — the intensity depends on the diameter:

140 mm — 2°
146 mm — 2°
168 mm — 4°
178 mm — 4°
194 mm — 5°
219 mm — 6°
245 mm — 7°

PKO114-SKIF

* — phasing is possible: 0, 45, 90, 180 — according to Customer’s request

** — other density is possible according to Customer’s requirement

*** — execution of VD by special order

**** — other body lengths are available on Customer’s request

***** — the intensity depends on the diameter:

168 mm — 2°
178 mm — 2°
194 mm — 3°
219 mm — 4°
245 mm — 5°

Perforation technology with two initiating heads

Advantages:   the time required for BPO is reduced by the period of one tripping operation – on average, the time saving is up to 24 hours resources are saved: less well-killing fluid is used; well workover costs are reduced    

Underbalance perforation technology followed by well completion using an ESP

Advantages: joint lowering of the perforation system and technological equipment; perforation and start of well completion in a single trip; can be used with a packer or anchor; equipped with a safety shock-absorbing system to protect technological equipment. the exclusion of the well silencing operation after the PVR, which prevents a negative impact on the productive horizon and preserves its natural filtration and capacitance properties.; the refusal to use silencing solutions allows for high economic efficiency of work.   When using MPSI: MPSI programmed to initiate firing upon reaching the required depression level; ability to cancel initiation at any time; capability for autonomous data recording before and during perforation.  

COMB-AT technology

Advantages: COMB-AT enables perforation and inflow stimulation in the well to be performed in a single operation; the use of COMB-AT combined with the PerfoLab simulation software represents a comprehensive approach to ensuring efficient and cost-effective well stimulation; the COMB-AT perforation system can be used for completing new wells, remedial perforation for inflow, waterflood/injection wells, as well as in perforation operations prior to hydraulic fracturing.     Operating principle: To initiate and propagate fractures in the surrounding reservoir rock, COMB-AT uses a specialized energetic solid propellant material that ignites after the detonation of the shaped charge, generating a high-energy pressure pulse. The result of this process is perforation channels with enhanced effectiveness.  

Cluster

Advantages: the possibility to design a perforating system for each specific application (typical object): the possibility to group various types of charges and ensure angular deviation of their axes; the use of CLUSTER technology during operations of hydraulic fracturing or gas-dynamic stimulation of the reservoir will facilitate the process of creating a system of fractures between the channels penetrated by shaped charges, reduce the required fracturing pressure, and increase the hydrodynamic efficiency of completion; high efficiency in perforation using Plug&Perf technology in horizontal sections of wells as part of multi-stage hydraulic fracturing.  

High-energy gas-dynamic fracturing technology using solid-fuel pressure generators (SFGP)

  Advantages:   Ability to obtain data on the potential of productive formations in wells of various purposes; Ability to achieve significant increase in well productivity with minimal financial and time expenditures; Minimal risk of formation damage (skin zone contamination); The generator’s design eliminates both the shaped charge and brisant effects; Efficiency and mobility: operations are carried out by a single geophysical crew without the need for heavy specialized equipment.  

PLUG&PERF TECHNOLOGY FOR MULTISTAGE FRACTURING WITH TARGETED DETONATION

Advantages:   import independence: the entire set of equipment and components is designed and manufactured in the Russian Federation; real-time process control; reduced perforation time — the ability to perform a single RIH (run-in-hole) operation with an assembly comprising up to twenty sections; run-in and pull-out operations are carried out without involving a well workover crew, significantly reducing operational costs; the AIS (Automated Initiation System) ensures safe operations — fully compliant with the API RP 67 standard.

Scroll to Top

Заказать звонок