Bvt-s / Coiled tubing perforation systems / Delayed electromechanical initiating head
Delayed electromechanical initiating head
Delayed electromechanical initiating head
Purpose
The possibility of remote initiation of perforation systems and the implementation of selective perforation in one SPO.
Технология Plug&Perf – это не просто очередной метод ГРП. Это демонстрация технологического суверенитета и операционного превосходства, которых мы добились.
| Characteristic | Delayed electromechanical initiating head |
|---|---|
| Max allowable operating hydrostatic pressure, MPa | 100 |
| Length, mm, max. | 1033 |
| Mass, kg, max | 25 |
| Outer diameter, mm, max | 76 |
| Min time delay for initiation, min | 5 |
| Max time delay for initiation, h | 24 |
| Memory gauge service life, runs/hours | 5/360 |
Advantages
Technological:
allows to carry out technological operations to create an optimal depression when opening productive layers.;
allows you to program the exact initiation delay time.;
provides the possibility of addressable initiation of several disconnected intervals in the presence of an arrangement of several EIGS.
Economic:
separate initiation of two (or more) devices launched at the same time reduces the number of descents;
The ability to combine multiple technologies provides more cost-effective work.
Safety:
A safety module is provided in the design, which ensures reliable opening of contact with the electric detonator on the surface.;
Insensitivity to electromagnetic interference, no radio silence required.
