Bvt-s / Technological solutions / Cluster
Cluster
Cluster
Purpose
Perforation of oil and gas wells in preparation for hydraulic fracturing using PKO73-AT, PKO89-AT to increase the efficiency of drilling and blasting operations by providing a higher density of channel concentrations both in volume and in the length of the perforation interval.
Plug&Perf technology is not just another hydraulic fracturing method. This is a demonstration of the technological sovereignty and operational superiority that we have achieved.
Advantages:
- the possibility to design a perforating system for each specific application (typical object): the possibility to group various types of charges and ensure angular deviation of their axes;
- the use of CLUSTER technology during operations of hydraulic fracturing or gas-dynamic stimulation of the reservoir will facilitate the process of creating a system of fractures between the channels penetrated by shaped charges, reduce the required fracturing pressure, and increase the hydrodynamic efficiency of completion;
- high efficiency in perforation using Plug&Perf technology in horizontal sections of wells as part of multi-stage hydraulic fracturing.
Standard configuration
- phasing;
- combined loading of big hole type (shaped charges) and deep penetration type charges.
Cluster system
- phasing: 60°
- edge groups – deep penetration type charges
- central group – BOPO-type charges
- angular deviation of charge axes: from +30° to -30°
